Four Points Sheraton Inn

Homewood, AL

The remodel of the Sheraton Hotel was done here in Homewood, AL. It was originally a Holiday Inn, and only took us two days to transform the outside to what it is today.  The hotel front door stayed open and  accessible to guests and there were no interruptions in their everyday operations. 

Building Code

  • NFPA 285 & 286 (Types I-IV)

  • IBC 2009, 2012 and 2015
    – Chapter 7: Fire Resistance Rated Construction
    – Chapter 16: Structure – Traverse Wind Load Resistance
    – Chapter 26: Type I-IV Noncombustible

  • IECC 2009, 2012 and 2015
    – Chapter 4: Continuous Air Barrier

  • IGCC 2012
    – Chapter 4: Continuous Air Barrier
    – Section 606
    – Alternative Compliance Path: ASHRAE 189.1-2009

Efficiency Standards

  • ASHRAE Energy Standards Compliance
    – ASHRAE 90.1 – 2007 and 2010
    – Section 5: Continuous Air Barrier

  • Green Building Standards Compliance
    – ASHRAE 189.1 – 2009 Normative Appendix B

  • LEED Eligibility: New Construction (NC) Categories:
    – Energy and Atmosphere (EA)
    – Materials and Resources (MR)
    – Innovation in Design (ID)

Test Protocols

  • ASTM E330: Structure Pre-set at 50% / 25 psf.

  • ASTM E283: Air Leakage at 6.24 psf.

  • ASTM E331: Static Water Resistance – Two hours at 6.24 psf.

  • ASTM E331: Static Water Pressure – 15 minutes at 8, 10, and 12 psf.

  • AAMA 501.1 : Dynamic Water Resistance at 12 psf.

  • ASTM E330: Structure Performance – 100% Design Pressure at 50 psf.

  • ASTM E330: Structure Performance – 150% Design Pressure at 75 psf.